Alameda Municipal Power (AMP) encourages all new construction to exceed California Title 24 Building Energy Efficiency Standards. As a result, they offer the following grant and rebate programs to AMP customers. Projects will only be funded if AMP receives and approves the application and performs a pre-installation inspection before work begins. A post-installation inspection must also be completed by AMP before the customer receives reimbursement.
Design Assistance Grants
Grants are available for design assistance which includes analysis, building modeling, and research. Owner incentives are up to $10,000 per project.
Whole Building Approach
Rebates are available for proposed buildings that exceed Title 24 by at least 10%. The analysis can be conducted by an energy consultant or the design team itself. Analysis must be completed using a comprehensive energy simulation tool that can model Title 24 requirements.
Building Systems Approach
Rebates are available for individual systems within a building, including HVAC and lighting.
Visit the program website or contact the utility for additional program information.
Implementing Sector: | Utility |
Category: | Financial Incentive |
State: | California |
Incentive Type: | Rebate Program |
Web Site: | https://www.alamedamp.com/243/New-Construction |
Administrator: | Alameda Municipal Power |
Start Date: | |
Eligible Renewable/Other Technologies: |
|
Incentive Amount: |
Design Assistance Grants: Up to $10,000/project Whole Building Approach Rebates: $0.10/kWh for buildings exceeding Title 24 by 10% $0.15/kWh for buildings exceeding Title 24 by 15% Systems Approach Rebates: $0.10/kWh for lighting systems exceeding Title 24 by 10% $0.11/kWh for HVAC and refrigeration systems exceeding Title 24 by 10% $0.10/kWh for motors exceeding Title 24 by 10% $0.04/kWh for daylighting exceeding Title 24 by 10% |
Equipment Requirements: |
Applicants must have, or expect to have, a valid AMP account, and projects must be installed on the account listed on the application form. The projects must utilize new, energy-efficient equipment. Used, reconditioned, rebuilt, or restored equipment does not qualify. All installed equipment must comply with the technical requirements of AMP's commercial retrofit programs - Lighting, HVAC, and Custom. All projects must have a pre-installation, if applicable, and post-installation inspection by AMP. AMP must approve (in writing) the project before work proceeds. AMP reserves the right to withhold funding for projects that do not meet technical requirements upon completion. In no case will AMP pay more than 100% of the actual non-taxed cost for the project, not to exceed $150,000 per customer, or 75% of the incremental costs associated with the upgrade. Applications will be accepted on a first-come, first-served basis until funds are exhausted. AMP reserves the right to modify or discontinue this program without prior notice at its discretion. |
Name: | Customer Service |
Organization: | Alameda Municipal Power |
Address: |
2000 Grand Street Alameda CA 94501 |
Phone: | (510) 748-3900 |
Email: | energymgt@alamedamp.com |
This information is sourced from DSIRE; the most comprehensive source of information on incentives and policies that support renewables and energy efficiency in the United States. Established in 1995, DSIRE is operated by the N.C. Clean Energy Technology Center at N.C. State University.