Interconnection Standards

June 04, 2024

Summary

In December 2003, the Nevada Public Utilities Commission (PUC) adopted interconnection standards for customers of NV Energy (formerly Nevada Power and Sierra Pacific Power) with on-site generation up to 20 megawatts (MW) in capacity. These standards are largely consistent with IEEE 1547 standards, California's interconnection rule (California Rule 21) and the model interconnection agreement developed by the National Association of Regulatory Utility Commissioners (NARUC). Significantly, the PUC determined that NV Energy may assess customer-generators for past fuel and purchased-power expenses in tariffs. NV Energy has incorporated the standards into their tariffs as Rule 15.

The interconnection standards approved by the PUC also updated Nevada's net-metering policy, originally enacted in 1997. Nevada Revised Statute 704.774 addresses basic interconnection requirements for net-metered renewable-energy systems with a maximum capacity of 10 kilowatts. This statute requires net-metered systems to meet standards established by the Institute of Electrical and Electronic Engineers (IEEE), the National Electrical Code (NEC), and Underwriters Laboratories (UL). Customers who complied with these guidelines could not be required to install additional equipment (such as a manual external disconnect switch), abide by additional safety requirements or purchase additional liability insurance. An October 2008 PUC order further clarified the issue of liability by specifically requiring the removal of any tariffs' obligation that the utility be named as an additional insured on the customer's insurance.

NV Energy has published a handbook for net metering and energy storage device interconnection.

Program Overview

Implementing Sector: State
Category: Regulatory Policy
State: Nevada
Incentive Type: Interconnection
Web Site:
Administrator:
Start Date:
Eligible Renewable/Other Technologies:
  • Geothermal Electric
  • Solar Thermal Electric
  • Solar Photovoltaics
  • Wind (All)
  • Biomass
  • Wind (Small)
  • Lithium-ion
Applicable Utilities: Investor-owned utilities
System Capacity Limit: 20 MW
Standard Agreement: No
Insurance Requirements: Vary by system size and/or type; levels established by PUC
External Disconnect Switch: Not addressed
Net Metering Required: No

Authorities

Name: NRS 704.744
Name: NV Energy Rule 15

Contact

Name: General Contact South Office
Organization: Public Utilities Commission of Nevada
Address: 9075 W. Diablo Drive, Suite 250
Las Vegas NV 89148
Phone: (702) 486-7210