Note: The Federal Infrastructure Investment and Jobs Act (IIJA) created the National Electric Vehicle Infrastructure (NEVI) Formula Grant Program with a total budget of $5 billion. Each state was allocated a share of that total to help build out a national network of electric vehicle charging stations along designated alternative fuel corridors (AFCs). With some limited exceptions, EV charging stations funded through the NEVI program should be spaced 50 miles apart and within one mile of the Interstate exit or highway.
The Wyoming Department of Transportation's (DOT) deployment plan stipulates that Wyomingites are currently not adopting the EV technology in enough numbers to require NEVI program station densities, with the greatest potential users being out-of-state travelers. The plan limits the number of additional NEVI-sized stations installed along interstates and recommends remaining funds be used for fuel corridor routes to State and National parks. The NEVI plan details several highlights including the use of matching funds from private or local jurisdictions, with no matching state funds to be used. The DOT will operate funds through a series of RFPs for biddings to construct, maintain, and operate stations along AFCs. The state deployment plan assumes that local jurisdictions and businesses are better suited to determine the size, frequency, location, and capacity of stations for their own needs and does not require that the stations must meet NEVI criteria. The plan will fund larger stations if local jurisdictions deem it appropriate. Deployment of the plan will result in the construction of 911 miles of EV charging corridors. The state's Final Year Two Plan was submitted in October 2023. In winter 2023/2024 WYDOT issued a RFI to gauge interest from private businesses or local governments who intend to apply for NEVI Funds.
Implementing Sector: | State |
Category: | Financial Incentive |
State: | Wyoming |
Incentive Type: | Grant Program |
Web Site: | https://www.dot.state.wy.us/home/planning_projects/zero-emission-vehicles/national-electric-vehicle-infrastructure-(nevi)-program.html |
Administrator: | Wyoming Department of Transportation |
Start Date: | |
Eligible Renewable/Other Technologies: |
|
Incentive Amount: | Varies, grants are awarded competitively |
Maximum Incentive: | Varies, grants are awarded competitively |
Equipment Requirements: | Projects must meet the standards established by 23 CFR Part 680 |
Name: | Public Law 117-58 |
Date Enacted: | 11/15/2021 |
Name: | 23 CFR Part 680 |
Date Enacted: | 02/28/2023 |
Name: | Nicholas Gronski |
Organization: | WY DOT - Procurement Services |
Address: |
5300 Bishop Blvd., Building 6189 Cheyenne WY 82009 |
Phone: | (307) 777-4106 |
Email: | nicholas.gronski2@wyo.gov |
This information is sourced from DSIRE; the most comprehensive source of information on incentives and policies that support renewables and energy efficiency in the United States. Established in 1995, DSIRE is operated by the N.C. Clean Energy Technology Center at N.C. State University.
Copyright © 2024 EnergyBot • All rights reserved.
1601 Bryan St Suite 900, Dallas, TX 75201